#6 Lake green is now cleared off and the power lines reconnected. There is quite a bit of damage from the branches poking into the ground, but it will be ok after a little TLC.
The new pump station is fantastic! The variable frequency drive (vfd) is even gentler on the pipes than I imagined.
No comments:
Post a Comment